GCEDC Approved Projects
2024 Projects
MedTech Landing, LLC
Project Details - MedTech Landing, LLC is proposing to develop 80 units of market-rate housing in the town of Batavia. The $15 million project would construct seven apartment buildings totaling 100,000 square-feet and anticipates creating two full-time-equivalent (FTE) positions.
Initial Resolution - January 11, 2024
Public Hearing - February 8, 2024 - Notice - Minutes - Video
Final Resolution - March 7, 2024
Project Close Date - March 22, 2024
Report to PARIS - Yes (Project 18012401A)
Leatherleaf Solar LLC
Project Details - Leatherleaf Solar, LLC is proposing to construct a community solar farm project on Ivison Road in the Town of Byron. The project will generate 5 MW (AC) of power.
Initial Resolution - March 7, 2024
Public Hearing - March 26, 2024 - Notice - Minutes - Video
Final Resolution - March 28, 2024
GE Bergen Owner, LLC
Project Details - GE Bergen Owner, LLC (Oxbo) is building a 196,000 square-foot facility at Apple Tree Acres in Bergen. The $43.6 million project proposes creating 60 new full-time equivalent (FTE) positions and retaining 140 FTE's.
Initial Resolution - June 6, 2024
Public Hearing - June 25, 2024 - Notice - Minutes - Video
Final Resolution - August 1, 2024
Project Close Date - September 11, 2024
Report to PARIS - Yes (Project 18012403A)
Graham Corporation
Project Details - Graham Corporation is proposing to build a 28,867 square-foot exapnsion to its City of Batavia facilities. The $17.6 million project proposes to creating 24 new full-time equivalent (FTE) positions and retain 267 FTE's.
Initial Resolution - July 11, 2024
Public Hearing - July 17, 2024 - Notice - Minutes - Video
Final Resolution - August 1, 2024
Project Close Date - August 28, 2024
Report to PARIS - Yes (Project 18012309A)
FFP NY LeRoy Project1, LLC
Project Details - FFP NY LeRoy Project1, LLC is proposing to construct a $13.5 million project that would generate 5 MW (AC) of solar energy in the town of LeRoy.
Initial Resolution - August 1, 2024
Public Hearing - August 21, 2024 - Notice - Minutes - Video
Final Resolution - September 5, 2024
FFP NY LeRoy Project2, LLC
Project Details - FFP NY LeRoy Project2, LLC is proposing to construct a $6.5 million project that would generate 2 MW (AC) of solar energy in the town of LeRoy.
Initial Resolution - August 1, 2024
Public Hearing - August 21, 2024 - Notice - Minutes - Video
Final Resolution - September 5, 2024
9 Lent Avenue, LLC
Project Details - 9 Lent Avenue, LLC (Rochester Davis Fetch Corp.) is proposing to expand its operations with the purchase and renovation of an existing facility in the village of LeRoy. The $3.8 million project includes renovation of the 32,500 square-foot facility and the creation of 4 new full-time equivalent (FTE) positions.
Initial Resolution - September 5, 2024
Public Hearing - October 1, 2024 - Notice - Minutes - Video
Final Resolution - October 3, 2024
Project Close Date - October 16, 2024
Appletree Acres, LLC
Project Details - Appletree Acres, LLC is proposing to construct a 15,000 square-foot expansion to an existing 50,000 square-foot warehouse located at the Apple Tree Acres corporate park. The $1.015 million project proposes creating 4 FTEs with an estimated salary range of $45,000 to $65,000 annually plus benefits.
9 Lent Avenue, LLC
Project Details - 9 Lent Avenue, LLC (Rochester Davis Fetch Corp.) is proposing to expand its operations with the construction of an 8,000 sq. ft. pole barn at 9 Lent Avenue in the village of LeRoy. The $265,000 project is in addition to the $3.8 million project to renovate an existing facility at 9 Lent Avenue and will be a stand-alone building for light fabrication and storage. This project proposes creating 2 new full-time equivalent (FTE) positions.
2023 Projects
Atlas Copco USA Holdings Inc. & Subsidiaries (Edwards)
Project Details - Edwards is planning to build a dry pump manufacturing facility and two-story office building at STAMP for Phase I of their semiconductor supply chain factory of the future. The Phase I capital investment will be $209.25 million and plans to create 343 FTE’s.
Initial Resolution - January 12, 2023
Public Hearing - January 31, 2023 - Notice - Minutes - Video
Final Resolution - February 2, 2023
Project Close Date - September 28, 2023
Report to PARIS - Yes (Project 18012302A)
Horizon Acres Associates, Inc.
Project Details - Horizon Acres Associates, Inc. is seeking to develop six flex commercial/industrial facilities that will total 1,500,000 square feet in the Town of Pembroke on 115 buildable acres. The $142 million total project will be completed in phases, and projects to create 400 FTE’s at full build-out.
Initial Resolution - January 12, 2023
Public Hearing - January 30, 2023 - Notice - Minutes - Video
Final Resolution - March 2, 2023
GSPP Route 262, LLC
Project Details - GSPP Route 262, LLC is proposing to construct a community solar farm project on Townline Road in the Town of Byron. The project will generate 5 MW of AC power.
Initial Resolution - March 30, 2023
Public Hearing - April 19, 2023 - Notice - Minutes - Video
Final Resolution - June 1, 2023
Assignment Resolution - September 5, 2024
LNK Holdings, Inc.
Project Details - LNK Holdings Inc. (Craft Cannery) is proposing to acquire and expand an agribusiness facility in Bergen which produces sauces, dressings, marinades, and other foods. The project will add 4,000 sq. ft. to the facility and support four full-time equivalent jobs and six retained jobs.
Initial Resolution - May 4, 2023
Public Hearing - May 23, 2023 - Notice - Minutes - Video
Final Resolution - March 28, 2024
Project Close Date - April 26, 2024
Report to PARIS - Yes (Project 18012304A)
Oak Orchard Solar 3, LLC
Project Details - Oak Orchard Solar 3, LLC is proposing to construct a community solar farm project on Oak Orchard Road in the Town of Batavia. The project will generate 5 MW of AC power.
Initial Resolution - August 3, 2023
Public Hearing - August 30, 2023 - Notice - Minutes - Video
Final Resolution - September 7, 2023
Project Close Date - January 30, 2024
Assignment Resolution - December 7, 2023
Report to PARIS - Yes (Project 1801 23 06A)
HP Hood LLC
Project Details - HP Hood LLC is proposing to construct a 32,500 sq. ft. expansion to accommodate approximately 7,500 more pallet positions in its automatic storage and retrieval system (ASRS) refrigerated warehouse. The project will also include the addition of new batching and processing systems, along with other upgrades which will allow the company to increase capacity and production of additional extended-shelf-life (ESL) beverage products.
Initial Resolution - September 7, 2023
Public Hearing - September 28, 2023 - Notice - Minutes - Video
Final Resolution - March 7, 2024
Countryside Apartments, LLC
Project Details - Countryside Apartments, LLC is proposing to construct four 21,096 sq. ft. buildings of market-rate housing in the Town of Pembroke. The $15.65 million project would be built in phases, with each building having eight 1-bedroom and 16 2-bedroom units.
Initial Resolution - October 5, 2023
Public Hearing - October 25, 2023 - Notice - Minutes - Video
Final Resolution - October 26, 2023
Supplemental Resolution - March 7, 2024
Authorizing Resolution - May 2, 2024
Project Close Date - March 22, 2024
Graham Corporation
Project Details - Graham Corporation is proposing a 18,900 sq. ft. expansion in the City of Batavia. The $13.9 million project includes a new commercial production facility intended to reduce design and manufacturing costs and improving ship capabilities for their US defense sector. The project will include a new building as well as new manufacturing equipment to grow Graham Corporation's workforce and production capabilities.
Initial Resolution - December 7, 2023
Public Hearing - January 4, 2024 - Notice - Minutes - Video
2022 Projects
Appletree Acres LLC
Project Details - Apple Tree Acres, LLC is building a 50,000 sq. ft. stand-alone facility on its property at Apple Tree Acres, in town of Bergen. The project is investing $3.15 million and is pledging to create 3 FTEs.
Initial Resolution - January 13, 2022
Public Hearing - February 2, 2022 - Notice - Minutes - Video
Final Resolution - May 5, 2022
Project Close Date - June 29, 2022
Report to PARIS - Yes (Project 1801 22 01A)
O-AT-KA Milk Products, LLC
Project Details - O-AT-KA Milk Products, LLC is planning to build a 3,200 sq. ft. addition to its existing facility in the town of Batavia to support increasing capacities for cream-based liquor beverage production. The project is planning to invest $3.1 million and is planning to create 2 FTEs.
Initial Resolution - May 5, 2022
Public Hearing - May 23, 2022 - Notice - Minutes - Video
Final Resolution - June 2, 2022
Project Close Date - July 29, 2022
Report to PARIS - Yes (Project 1801 22 04A)
NEXgistics
Project Details - NEXgistics is planning to construct a 140,000 square-foot facility on Vision Parkway in the Town of Pembroke. The $17.6 million project includes a distribution center and national headquarters.
Initial Resolution - August 4, 2022
Public Hearing - August 22, 2022 - Notice - Minutes - Video
Final Resolution - September 1, 2022
Project Close Date - March 10, 2023
Report to PARIS - YES (Project 1801 22 07A)
Ivy Village Corp
Project Details - Ivy Village Corp is planning to construct a market-rate adult patio home development on 16 acres in the Village of Le Roy. The proposed $3.72 million project is for the construction of the initial 10 duplex residences (20 units total).
Initial Resolution - July 7, 2022
Public Hearing - July 26, 2022 - Notice - Minutes - Video
Final Resolution - August 4, 2022
Project Close Date - July 28, 2023
Report to PARIS - YES (1801 22 08A)
AES Rt 5 Storage LLC
Project Details - AES Rt 5 Storage, LLC is proposing to construct a community solar farm project on West Main Road in the Town of Le Roy. The project will utilize ground-mounted solar panels to convert the sun’s energy into 5 MW of AC power.
Initial Resolution - November 1, 2022
Public Hearing - November 22, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - June 24, 2024
Report to PARIS - Yes (Project 1801 22 10A)
Hecate Energy Cider Solar LLC
Project Details - Hecate Energy Cider Solar LLC is proposing to construct a utility scale solar farm project at various properties in the towns of Elba and Oakfield. The project will be located on 2,455 acres and utilize solar panels mounted on tracking panel racks to convert the sun's energy into 500 MW of AC power and will be interconnected with the electric grid.
Initial Resolution - November 1, 2022
Public Hearing (Elba) - November 28, 2022 - Notice - Minutes - Video
Public Hearing (Oakfield) - November 28, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Supplemental Resolution - September 19, 2024
Supplemental Public Hearing (Elba) - October 3, 2024 - Notice - Minutes - Video
Supplemental Public Hearing (Oakfield) - October 3, 2024 - Notice - Minutes - Video
Supplemental Resolution - October 3, 2024
Project Close Date - September 13, 2024
Report to PARIS - Yes (Project 1801 22 11 A)
RPNY Solar 6 LLC
Project Details - RPNY Solar 6, LLC is proposing to construct a community solar farm project on Alexander Road in the Town of Batavia. The project will utilize 8,346 solar panels and 24 string inverters on approximately 17 of 29 acres on the property to convert the sun’s energy into 3 MW of AC power.
Initial Resolution - November 1, 2022
Public Hearing - November 21, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - August 3, 2023
Assignment Resolution - June 1, 2023
Report to PARIS - YES (Project 1801 22 12A)
RPNY Solar 7 LLC
Project Details - RPNY Solar 7, LLC is proposing to construct a community solar farm project on Alexander Road in the Town of Batavia. The project will utilize 6,214 solar panels and 20 string inverters on approximately 13 of 69 acres on the property to convert the sun’s energy into 2.5 MW of AC power.
Initial Resolution - November 1, 2022
Public Hearing - November 21, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - August 3, 2023
Assignment Resolution - June 1, 2023
Report to PARIS - YES (Project 1801 22 13A)
NY CDG Genesee 4 LLC
Project Details - NY CDG Genesee 4 LLC is proposing to construct a community solar farm on Shepard Road in the town of Pavilion. The solar project will be located on approximately 31 of 39 acres on the property to convert the sun's energy into 4.275 MW of AC power.
Initial Resolution - December 1, 2022
Public Hearing - January 4, 2023 - Notice - Minutes - Video
Final Resolution - January 12, 2023
Project Close Date - February 29, 2024
Report to PARIS - Yes (Project 1801 22 14A)
8250 Park Road LLC
Project Details - 8250 Park Road LLC is planning to purchase and renovate the former Quality Inn & Suites and Palm Island Indoor Water Park on Park Road in the Town of Batavia. The $12 million project will enable the company to upgrade the water park, hotel rooms, lobbies, event spaces, and on-site restaurant. The project pledges to create 38 full-time equivalent positions.
Initial Resolution - October 6, 2022
Public Hearing - October 26, 2022 - Notice - Minutes - Video
Final Resolution - November 1, 2022
Report to PARIS - Project in Process
J&R Fancher Property Holdings
Project Details - J&R Fancher Property Holdings LLC is planning to build a facility at Buffalo East Technology Park in the town of Pembroke on three acres. The facility will total 52,332 sq. ft. of which 45,000 sq.ft. pre-engineered steel warehouse building with 7,332 sq. ft. office. The project is investing $3.25 million and planning on creating 4 FTE’s.
Initial Resolution - March 3, 2022
Public Hearing - March 21, 2022 - Notice - Minutes - Video
Final Resolution - March 29, 2022
Report to PARIS - Project in Process
2021 Projects
LandPro Equipment LLC
Project Details - LandPro Equipment LLC is proposing to acquire and develop a 14-acre parcel in the town of Batavia, including the construction of a 50,000 square-foot facility for a full-service John Deere Agriculture and Turf Dealership. The company proposes to create five new jobs and retain 62 existing jobs as part of the $9.2 million project. The facility would service a customer base within a 50-mile radius of Batavia, NY and expand workforce training programs for the benefit of the company and Genesee County's workforce.
Initial Resolution - February 4, 2021
Public Hearing - February 24, 2021 - Notice - Minutes - Video
Final Resolution - March 4, 2021
Project Close Date - June 25, 2021
Report to PARIS - Yes (Project 1801 21 01A)
Plug Power Inc.
Project Details - Plug Power Inc. is proposing a $232 million project at the Western New York Science & Technology Advanced Manufacturing Park in the town of Alabama. The operation will produce green hydrogen using an electrolysis process of water utilizing clean hydropower.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - March 25, 2021
Public Hearing - June 3, 2021 - Notice - Minutes - Video
Supplemental Resolution - June 3, 2021
Authorizing Resolution - October 6, 2022
Project Close Date - November 8, 2021
Report to PARIS - Yes (Project 1801 21 04A)
Forefront Power LLC (Elba Solar)
Project Details - Forefront Power LLC is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - May 6, 2021
Project Close Date - October 20, 2023
Assignment Resolution - May 4, 2023
Report to PARIS - Yes (1801 21 05A)
Batavia Special Needs Apartments
Project Details - Batavia Special Needs Apartments, L.P. is proposing a $3.75 million expansion project in the City of Batavia. The applicant currently owns and operates a 42 unit building of special needs housing and will construct an additional 20 units for a total of 62 units.
Initial Resolution - March 25, 2021
Public Hearing - April 14, 2021 - Notice - Minutes - Video
Final Resolution - May 6, 2021
Project Close Date - September 15, 2021
Report to PARIS - Yes (Project 1801 21 09A)
Just Chez Realty (206 E. Main St.)
Project Details - Just Chez Realty, LLC, is proposing a $450,000 renovation project in the City of Batavia as part of Batavia's Downtown Revitalization Initiative. The project will create two market-rate apartments and follows the completion of first-floor improvements to the building.
Final Resolution - July 1, 2021
Project Close Date - February 28, 2022
Report to PARIS - Yes (1801 21 10A)
NY CDG Genesee 1 LLC
Project Details - The company is proposing a 5 MW community solar farm project in the Town of Elba (Elba School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - May 6, 2021
Public Hearing - May 17, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Project Close Date - February 29, 2024
Assignment Resolution - January 12, 2023
Report to PARIS - Yes (1801 21 11A)
Trousdale Solar, LLC
Project Details - The company is proposing a 5 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Authorizing Resolution - September 1, 2022
Project Close Date - April 7, 2022
Report to PARIS - Yes (Project 1801 21 12A)
Trousdale Solar II, LLC
Project Details - The company is proposing a 4 MW community solar farm project in the Town of Batavia (Batavia School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Authorizing Resolution - September 1, 2022
Project Close Date - April 7, 2022
Report to PARIS - Yes (Project 1801 21 13A)
Gateway GS, LLC
Project Details - Gateway GS LLC (Gallina Development) is proposing to build out a third building at the GCEDC's Gateway II Corporate Park in the town of Batavia. Facility will be 27,000 SF and will be completed in 2022 for a single logistics-distribution tenant.
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Updated Final Resolution - January 13, 2022
Authorizing Resolution - March 3, 2022
Project Close Date - September 29, 2021
Report to PARIS - Yes (Project 1801 21 15A)
Liberty Pumps
Project Details - Liberty Pumps is proposing to expand their operation in the Town of Bergen at Apple Tree Acres industrial park. The company is planning to construct a warehouse and manufacturing space of 107,138 sf to support continuing growth of Liberty Pumps. The project is investing $13.7 million and is pledging to create 30 FTEs with an average salary of $52,000 annually plus benefits.
Initial Resolution - August 5, 2021
Public Hearing - August 26, 2021 - Notice - Minutes - Video
Final Resolution - September 9, 2021
Project Close Date - November 21, 2021
Report to PARIS - Yes (Project 1801 21 16A)
Valiant Real Estate USA, Inc.
Project Details - Valiant Real Estate USA, Inc. is proposing to build a new 20,000 sq. ft. facility on the corner of Saile Drive and Call Parkway in the town of Batavia. The project is investing $4.5 million and is pledging to create 24 FTEs with an average salary range of $30,000-$75,000 annually plus benefits.
Initial Resolution - September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - December 2, 2021
Project Close Date - December 21, 2021
Report to PARIS - Yes (Project 1801 21 17A)
J&R Fancher Property Holdings LLC (Brickhouse Commons LLC)
Project Details - J&R Fancher Property Holdings, LLC is proposing to construct a 14,000 square foot 2-story mixed-used building on 2.6 buildable acres at Buffalo East Technology Park in Pembroke. The $1.7 million project includes the creation of six market rate 1-bedroom and 2-bedroom apartments on the second floor, and a 7,000 "vanilla" box interior space to attract commercial tenants.
Initial Resolution - September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - October 7, 2021
Project Close Date - May 19, 2022
Report to PARIS - Yes (1801 21 18A)
Mega Properties
Project Details - Mega Properties, Inc. is proposing to purchase a 147,000 square foot distribution facility on Federal Drive in the town of Batavia. The project is investing $8.5 million and is pledging to create 11 FTEs with an average salary range of $30,000-$80,000 annually plus benefits.
Initial Resolution - December 2, 2021
Public Hearing - December 21, 2021 - Notice - Minutes - Video
Final Resolution - January 13, 2022
Project Close Date - December 2, 2022
Report to PARIS - Yes (Project 1801 21 19A)
Solar Liberty 1
Project Details - Solar Liberty is proposing a 4 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - March 25, 2021
Report to PARIS - Project in Process
Solar Liberty 2
Project Details - Solar Liberty is proposing a 5 MW community solar farm project in the Town of Pembroke (Akron School District) that will be interconnected with National Grid and provide power to subscribers.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - March 25, 2021
Report to PARIS - Project in Process
Excelsior Energy Center
Project Details - Excelsior Energy Center is proposing a 280 MW utility scale solar project in the Town of Byron (Byron-Bergen School District) that will be interconnected with the electric grid.
Initial Resolution - March 25, 2021
Public Hearing - April 19, 2021 - Notice - Minutes - Video
Final Resolution - June 3, 2021
Authorizing Resolution - September 7, 2023
Report to PARIS - Project in Process
2020 Projects
241 Knapp Solar 1, LLC
Project Details - 241 Knapp Solar 1, LLC (Borrego Solar) is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.
Initial Resolution - February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 01A)
241 Knapp Solar 2, LLC
Project Details - 241 Knapp Solar 2, LLC (Borrego Solar) is a proposed community solar project in the town of Pembroke (Akron School District) that would generate 5 MW of power to subscribers.
Initial Resolution - February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 02A)
Townline Batavia Solar 1, LLC
Project Details - Townline Batavia Solar 1, LLC (Borrego Solar) is a proposed community solar project in the town of Batavia (Elba School District) that would generate 5 MW of power to subscribers.
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 03A)
3104 Batavia Solar, LLC
Project Details - 3104 Batavia Solar, LLC (Borrego Solar) is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 3 MW of power to subscribers.
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - May 22, 2020
Report to PARIS - Yes (Project 1801 02 04A)
3232 Batavia Solar, LLC
Project Details - 3232 Batavia Solar, LLC (Borrego Solar) is a proposed community solar project in the town of Batavia (Pembroke School District) that would generate 4 MW of power to subscribers.
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - May 22, 2020
Report to PARIS - Yes (Project 1801 02 05A)
Ellicott Station LLC
Project Details - The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.
Initial Resolution - February 6, 2020
Public Hearing - March 3, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Authorizing Resolution - July 1, 2021
Authorizing Resolution - October 28, 2021
Project Close Date - July 21, 2021
Report to PARIS - Yes (Project 1801 21 07A)
Ellicott Station Commercial LLC
Project Details - The Ellicott Station project is a proposed mixed-use brownfield redevelopment project including adaptive re-use and new construction of a blighted property in the city of Batavia. The $22.4 million total investment would complete the brownfield remediation of the 3.31-acre site, construct a new five-story modern workforce housing apartment building, and renovate an existing building for a restaurant/beer garden and brewery.
Initial Resolution - February 6, 2020
Public Hearing - March 3, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Authorizing Resolution - July 1, 2021
Authorizing Resolution - October 28, 2021
Project Close Date - July 21, 2021
Report to PARIS - Yes (Project 1801 21 08A)
Bright Oak Solar, LLC
Project Details - Bright Oak Solar, LLC is a proposed community solar project in the town of Batavia (Oakfield-Alabama School District) that would generate 4 MW of power to subscribers.
Initial Resolution - May 7, 2020
Public Hearing - May 26, 2020 - Notice - Minutes - Video
Final Resolution - June 4, 2020
Project Close Date - September 30, 2020
Report to PARIS - Yes (1801 20 09A)
Fraser-Branche Property, LLC
Project Details - The company plans to acquire and renovate an existing 13,000 sq. ft. facility in the city of Batavia to accommodate the expansion of their pediatric medical practice alongside existing tenants.
Initial Resolution - October 31, 2019
Public Hearing - November 20, 2019 - Notice - Minutes
Final Resolution - July 2, 2020
Project Close Date - September 3, 2020
Report to PARIS - Yes (Project 1801 20 10A)
Batavia Solar, LLC
Project Details - Batavia Solar, LLC is a proposed community solar project in the town of Batavia (Byron-Bergen School District) that would generate 1.65 MW of power to subscribers.
Initial Resolution - August 6, 2020
Public Hearing - September 2, 2020 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Project Close Date - January 27, 2023
Assignment Resolution - August 1, 2024
Assignment Resolution - October 3, 2024
Report to PARIS - Yes (1801 21 14A)
2019 Projects
Churchville Fire Equipment Corp.
Project Details - The company is purchasing an existing facility to be their new truck set-up shop and truck refurbishment center.
Final Resolution - January 10, 2019
Project Close Date - February 7, 2019
Report to PARIS - Yes (Project 1801 19 01A)
CVO Central, LLC (Custom Vehicle Outfitters)
Project Details - The distribution company is moving from a leased facility to purchasing the former PW Minor existing facility in the City of Batavia. The company's project will seek to make renovations to the facility.
Final Resolution - March 28, 2019
Project Close Date - June 24, 2019
Report to PARIS - Yes (Project 1801 19 03A)
Gateway GS, LLC
Project Details - The company has built a 27,000 sq. ft. speculative building at Gateway II Corporate Park in Batavia. This will be Phase 1 of 5; interior buildout of the first building. The building is engineered to be flexible for prospective tenants, who will ultimately lease the space and have input to the final buildout. The tenants that this type of building will attract include warehouse, distribution, light manufacturing, technology, and office space tenants.
Initial Resolution - February 7, 2019
Public Hearing - March 5, 2019 - Notice - Minutes
Final Resolution - March 7, 2019
Project Close Date - May 1, 2019
Report to PARIS - Yes (Project 1801 19 04A)
Mucher & Clark, LLC (Cedar Street Rentals)
Project Details - The company plans to build an extension of its retail store by constructing a 6,000 sq. ft. warehouse at 52 Cedar Street. Cedar Street Sales & Rental has been in Business since 1993 and needs to expand to meet customer demand.
Final Resolution - June 6, 2019
Project Close Date - October 4, 2019
Report to PARIS - Yes (Project 1801 19 05A)
Graham Corporation
Project Details - The company plans three projects at its City of Batavia campus which will renovate 8,000 sq. ft. of existing buildings and add 5,000 sq. ft. of new warehouse space, including expansion of on-site training and welding school facilities, and warehousing.
Project Application / Supplemental Project Application
Initial Resolution - February 7, 2019
Public Hearing - February 26, 2019 - Notice - Minutes
Final Resolution - August 1, 2019
Supplemental Initial Resolution - August 1, 2019
Supplemental Public Hearing - August 26, 2019 - Notice - Minutes
Supplemental Final Resolution - September 5, 2019
Project Close Date - November 1, 2019
Report to PARIS - Yes (Project 1801 19 06A)
Provident Batavia, LLC
Project Details - The company is looking to construct a 13,000 sq. ft. addition to an existing office, warehouse and distribution facility leased to SCP Pools in the Town of Batavia. This project enables the growth of SCP Pools.
Initial Resolution - July 11, 2019
Public Hearing - July 30, 2019 - Notice - Minutes
Final Resolution - September 5, 2019
Project Close Date - November 12, 2019
Report to PARIS - Yes (Project 1801 19 07A)
Six Flags Darien, LLC
Project Details - The company is adding a new attraction to the park for the 2020 operating season.
Initial Resolution - September 5, 2019
Public Hearing - October 2, 2019 - Notice - Minutes
Final Resolution - October 3, 2019
Project Close Date - October 3, 2019
Report to PARIS - Yes (Project 1801 19 08A)
Wright Associates, LLC
Project Details - The company is planning to acquire and renovate an existing 139,000 sq. ft. facility to expand product lines and distribution markets in the Western New York and the Finger Lakes regions.
Initial Resolution - October 3, 2019
Public Hearing - October 29, 2019 - Notice - Minutes
Final Resolution - October 31, 2019
Project Close Date - November 27, 2019
Report to PARIS - Yes (Project 1801 19 09A)
Ken Wendt's Propane Gas Service, Inc.
Project Details - The company is planning to build a 9,600 sq. ft. facility at the corner of Route 19 and North Road in the Town of LeRoy. The company plans to expand its propane service to local residential, commercial, industrial, and agricultural customers.
Initial Resolution - August 1, 2019
Public Hearing - August 27, 2019 - Notice - Minutes
Final Resolution - October 31, 2019
Authorizing Resolution - March 29, 2022
Project Close Date - December 18, 2019
Report to PARIS - Yes (Project 1801 19 10A)
2018 Projects
Saile Properties, LLC (L&M Specialty Fabrication)
Project Details - Saile Properties, LLC plans to construct a 21,100 sq. ft. facility in Batavia for expansion of specialty agricultural equipment manufacturing and repair business.
Initial Resolution - September 1, 2016
Public Hearing - September 21, 2016 - Notice - Minutes
Final Resolution - February 1, 2018
Project Close Date - April 1, 2018
Report to PARIS - Yes (Project 1801 18 02A)
Xylem Dewatering Solutions, Inc.
Project Details - Xylem (Godwin Pumps) plans to expand their existing facility in Batavia by 8,100 sq. ft.
Initial Resolution - March 29, 2018
Public Hearing - April 17, 2018 - Notice - Minutes
Final Resolution - May 3, 2018
Project Close Date - May 31, 2018
Report to PARIS - Yes (Project 1801 18 03A)
Genesee Lumber Co., Inc.
Project Details - Genesee Lumber Company plans to demolish an existing structure and construct a 7,158 sq. ft. warehouse in Batavia to store lumber and other building products to better service customers in Genesee County and the surrounding region. This project will contribute to the City of Batavia's Batavia Pathway to Prosperity program.
Final Resolution - March 29, 2018
Project Close Date - February 28, 2019
Report to PARIS - Yes (Project 1801 18 04A)
J-Rental, Inc.
Project Details - J-Rental, Inc plans to build a 60,000 sq. ft. facility at Apple Tree Acres in Bergen.
Initial Resolution - June 7, 2018
Public Hearing - June 26, 2018 - Notice - Minutes
Final Resolution - July 12, 2018
Project Close Date - February 27, 2019
Report to PARIS - Yes (Project 1801 18 05A)
Pearl Solar, LLC
Project Details - Pearl Solar, LLC plans to build a 2 MW community solar farm project in Batavia.
Initial Resolution - July 12, 2018
Public Hearing - July 30, 2018 - Notice - Minutes
Final Resolution - August 2, 2018
Project Close Date - January 11, 2019
Report to PARIS - Yes (Project 1801 18 07A)
Pearl Solar II, LLC
Project Details - Pearl Solar II, LLC plans to build a 2 MW community solar farm project in Batavia.
Initial Resolution - July 12, 2018
Public Hearing - July 30, 2018 - Notice - Minutes
Final Resolution - August 2, 2018
Project Closing Date - January 11, 2019
Report to PARIS - Yes (Project 1801 18 08A)
Amada North America, Inc.
Project Details - Amada North America, Inc. is planning a 19,000 sq. ft. expansion to their manufacturing facility in Batavia. In addition to the $2.3M construction project, the company is investing over $6.5M in new equipment.
Initial Resolution - September 6, 2018
Public Hearing - October 2, 2018 - Notice - Minutes
Final Resolution - October 4, 2018
Project Close Date - November 9, 2018
Report to PARIS - Yes (Project 1801 18 10A)
2017 Projects
HP Hood, LLC (Project Dairy) - 1801 17 01A
Project Details - HP Hood, LLC plans to purchase, refurbish, restart, and expand an existing dairy processing facility at the Genesee Valley Agri-Business Park in Batavia. The project would invest $205M in facility, processing and filling equipment, building improvements including adding new construction of a 100,000 sq. ft. refrigerated warehouse.
Initial Resolution - June 12, 2017
Public Hearing - June 27, 2017 - Notice - Minutes
Final Resolution - June 27, 2017
Project Close Date - June 30, 2017
Report to PARIS - Yes (Project 1801 17 01A)
ADVJ Realty, LLC (Coach Tony's)
Project Details - Coach Tony's, a specialty food processor of sauces, plans to construct a 5,000 sq. ft. building at the Apple Tree Acres Corporate Park in Bergen.
Final Resolution - July 11, 2017
Project Close Date - February 20, 2018
Assignment Resolution - May 4, 2023
Report to PARIS - Yes (Project 1801 17 02A)
Freightliner & Western Star of Batavia, LLC
Project Details - Freightliner & Western Star of Batavia, LLC plans to construct a 40,000 sq. ft. parts warehouse and service center in Batavia.
Initial Resolution - July 14, 2016
Public Hearing - July 29, 2016 - Notice - Minutes
Final Resolution - July 11, 2017
Project Close Date - August 31, 2018
Report to PARIS - Yes (Project 1801 17 03A)
Genesee and Mohawk Valley Railroad Co., Inc. (GVT)
Project Details - Genesee and Mohawk Valley Railroad Co., Inc. plans to add 12,160 sq. ft. expansion to its existing 25,000 sq. ft. cross dock facility in Batavia.
Initial Resolution - March 2, 2017
Public Hearing - March 28, 2017 - Notice - Minutes
Final Resolution - May 4, 2017
Project Close Date - August 15, 2017
Report to PARIS - Yes (Project 1801 17 04A)
6520 N. Lake Rd, LLC (Triple-O Mechanical)
Project Details - 6250 N. Lake Rd, LLC plans to expand their current facility (6,960 sq. ft.) in the Town of Bergen with the addition of a 7,644 sq. ft. warehouse.
Final Resolution - October 5, 2017
Project Close Date - January 1, 2018
Report to PARIS - Yes (Project 1801 17 08A)
212 West Main Street, Inc.
Project Details - 212 West Main Street, Inc. plans a complete interior and exterior renovation, along with purchasing equipment. The total project cost is estimated at $895,000. The project has extraordinary re-development costs associated with the property because it is located within a federally designated flood hazard area. The project is legally allowable for benefits as it is in/or adjacent to a highly distressed census tract.
Final Resolution - October 5, 2017
Project Close Date - November 1, 2017
Report to PARIS - Yes (Project 1801 17 09A)
O-AT-KA Milk Products Cooperative, Inc.
Project Details - O-AT-KA plans to construct a 20,075-sq. ft. expansion of the current facility increase future growth opportunities for the business. The company plans to invest approximately $4.3M and retain 308 jobs.
Initial Resolution - October 5, 2017
Public Hearing - October 24, 2017 - Notice - Minutes
Final Resolution - October 26, 2017
Project Close Date - March 1, 2018
Report to PARIS - Yes (Project 1801 17 11A)
2016 Projects
Genesee County Chamber of Commerce
Project Details - The Genesee County Chamber of Commerce plans to purchase and renovate an existing building for use of its offices as well as the County's tourism office, and add a new 560 sq. ft., two-story glass structure for a Genesee County Visitors Tourism Center.
Final Resolution - October 1, 2015
Project Close Date - January 29, 2016
Report to PARIS - Yes (Project 1801 16 01A)
Upstate Niagara Cooperative (former Alpina Foods LLC)
Project Details - The former owner of the facility, now owned by Upstate Niagara Cooperative, plans to construct a 3,200 sq. ft. addition to an existing facility to add a new bottle filling machine and package equipment to produce drinkable yogurt.
Final Resolution - May 5, 2016
Project Close Date - May 5, 2016
Report to PARIS - Yes (Project 1801 16 03A)
Mega Properties
Project Details - Mega Properties plans to expand its current 45,000 sq. ft. logistics facility hosting Koolatron Corporation and other tenants in the Gateway I Corporate Park by 25,000 sq.
Initial Resolution - March 3, 2016
Public Hearing - March 23, 2016 - Notice - Minutes
Final Resolution - November 4, 2016
Authorizing Resolution - December 16, 2016
Project Close Date - May 12, 2017
Report to PARIS - Yes (Project 1801 16 04A)
Empire Pipeline Inc.
Initial Resolution - October 6, 2016
Public Hearing - October 24, 2016 - Notice - Minutes
Final Resolution - December 1, 2016
Project Close Date - December 1, 2016
Report to PARIS - Yes (Extension of Project 1801 07 04B)
2015 Projects
Manning Squires & Hennig
Initial Resolution - June 4, 2015
Public Hearing - June 23, 2015 - Notice - Minutes
Final Resolution - June 25, 2015
Authorizing Resolution - December 17, 2015
Project Close Date - June 25, 2015
Report to PARIS - Yes (Project 1801 15 04A)
ADK Hospitality
Initial Resolution - June 4, 2015
Public Hearing - June 22, 2015 - Notice - Minutes
Final Resolution - June 25, 2015
Project Close Date - September 4, 2015
Report to PARIS - Yes (Project 1801 15 05A)
OATKA Milk Products Cooperative Inc.
Initial Resolution - August 13, 2015
Public Hearing - August 31, 2015 - Notice - Minutes
Final Resolution - September 3, 2015
Project Close Date - October 1, 2015
Report to PARIS - Yes (Project 1801 15 06A)
Reinhart Enterprises
Initial Resolution - September 3, 2015
Public Hearing - September 23, 2015 - Notice - Minutes
Final Resolution - October 1, 2015
Project Close Date - October 1, 2015
Report to PARIS - Yes (Project 1801 15 07A)
2014 Projects
Tompkins Insurance Agencies, Inc.
Final Resolution - March 6, 2014
Project Close Date - April 7, 2014
Report to PARIS - Yes (Project 1801 14 01A)
Mega Properties, Inc.
Initial Resolution - June 6, 2013
Public Hearing - June 26, 2013 - Notice - Minutes
Final Resolution - April 3, 2014
Project Close Date - June 16, 2014
Report to PARIS - Yes (Project 1801 14 03A)
R.J. Properties LLC (Liberty Pumps)
Initial Resolution - March 6, 2014
Public Hearing - April 3, 2014 - Notice - Minutes
Final Resolution - May 1, 2014
Project Close Date - August 1, 2014
Report to PARIS - Yes (Project 1801 14 06A)
2013 Projects
CLP Darien Lake, LLC
Initial Resolution - February 7, 2013
Public Hearing - March 1, 2013 - Notice - Minutes
Final Resolution - March 3, 2013
Project Close Date - February 7, 2013
Report to PARIS - Yes (Project 1801 13 01A)
Imagination Industries
Final Resolution - June 6, 2013
Authorizing Resolution - July 11, 2013
Project Close Date - July 11, 2013
Report to PARIS - Yes (Project 1801 13 07A)
Yancey’s Fancy
Initial Resolution - March 7, 2013
Public Hearing - April 16, 2013 - Notice - Minutes
Supplemental Initial Resolution - September 5, 2013
Supplemental Public Hearing - September 25, 2013 - Notice - Minutes
Final Resolution - October 3, 2013
Project Close Date - March 25, 2014
Supplemental Initial Resolution - October 3, 2019
Supplemental Public Hearing - October 23, 2019 - Notice - Minutes
Supplemental Final Resolution - October 31, 2019
Project Close Date - April 1, 2020
Supplemental Project Agreement
Report to PARIS - Yes (Project 1801 13 14A)
Graham Corporation
Initial Resolution - August 1, 2013
Public Hearing - August 21, 2013 - Notice - Minutes
Final Resolution - September 5, 2013
Supplemental Public Hearing - October 22, 2013 - Notice - Minutes
Supplemental Final Resolution - November 7, 2013
Supplemental Final Resolution - July 10, 2014
Project Close Date - August 1, 2013
Report to PARIS - Yes (Project 1801 13 17A)
2012 Projects
Lassiter Properties
Final Resolution - March 1, 2012
Project Close Date - March 1, 2012
Report to PARIS - Yes (Project 1801 12 04A)
5272 Clinton St Rd, LLC
Final Resolutionn - March 1, 2012
Project Close Date - March 1, 2012
Report to PARIS - Yes (Project 1801 12 05A)
Perry Veterinary Clinic PPLC
Final Resolution - May 3, 2012
Project Close Date - June 12, 2012
Report to PARIS - Yes (Project 1801 12 07A)
Steval LLC (LeRoy Motors / Bob Johnson GM)
Final Resolution - June 12, 2012
Project Close Date - July 1, 2012
Report to PARIS - Yes (Project 1801 12 11A)
2011 Projects
Call Farms, Inc. (Monroe Tractor)
Final Resolution - March 31, 2011
Project Close Date - March 31, 2011
Report to PARIS - Yes (Project 1801 11 02A)
Graham Corporation
Initial Resolution - July 7, 2011
Public Hearing - July 26, 2011 - Notice - Minutes
Final Resolution - August 4, 2011
Project Close Date - July 7, 2011
Report to PARIS - Yes (Project 1801 11 03A)
Alpina Foods LLC (Upstate Niagara Cooperation)
Initial Resolution - April 14, 2011
Public Hearing - May 3, 2011 - Notice - Minutes
Final Resolution - June 2, 2011
Project Close Date - June 2, 2011
Report to PARIS - Yes (Project 1801 11 07A)
Berkshire Hospitality
Initial Resolution - December 2, 2010
Public Hearing - February 1, 2011 - Notice - Minutes
Final Resolution - April 14, 2011
Project Close Date - October 1, 2011
Report to PARIS - Yes (Project 1801 11 08A)
Marktec Products, Inc. (Cox Properties LLC)
Final Resolution - August 4, 2011
Project Close Date - November 1, 2011
Report to PARIS - Yes (Project 1801 1109A)
Adams Welding and Fabrication
Final Resolution - November 3, 2011
Project Close Date - December 1, 2011
Report to PARIS - Yes (Project 1801 11 10A)
2010 Projects
Parc Darien Lake, LLC
Public Hearing - March 11, 2010 - Notice - Minutes
Final Resolution - March 11, 2010
Project Close Date - March 11, 2010
Report to PARIS - Yes (Project 1801 10 02A)
2008 Projects
Batavia Special Needs APARTMENTS, L.P.
Initial Resolution - February 29, 2008
Public Hearing - April 24, 2008 - Notice - Minutes
Final Resolution - November 25, 2008
Project Close Date - March 23, 2009
Report to PARIS - Yes (Project 1801 08 07A)
Wedge 24 (Creekside)
Final Resolution - March 14, 2008
Project Close Date - March 14, 2008
Report to PARIS - Yes (Project 1801 08 09A)
2007 Projects
Empire Pipeline
Initial Resolution - January 23, 2007
Public Hearing - March 13, 2007 - Notice - Minutes
Final Resolution - March 14, 2007
Project Close Date - July 1, 2007
Report to PARIS - Yes (Project 1801 07 04B)
2006 Projects
Wellsville Carpet Town, Inc.
Preliminary Resolution - April 12, 2006
Initial Resolution - April 27, 2006
Public Hearing - July 6, 2006 - Minutes
Final Resolution - July 12, 2006
Public Hearing - August 28, 2006 - Notice - Minutes
Project Close Date - April 27, 2006
Report to PARIS - Yes (Project 1801 06 08A)