GCEDC Projects
2026 Projects
STREAM U.S. Data Centers, LLC
Project Details - STREAM U.S. Data Centers, LLC is proposing to construct a 2.2 million square-foot data center at the Western New York Science & Technology Advanced Manufacturing Park.
SEQR Development Application - December 12, 2025 (Updated Below)
SEQR Lead Agency Resolution - December 18, 2025
Sketch Plan Submission - December 22, 2025
Project Application Response Request - January 5, 2026
Site Plan Application - January 12, 2026
- Site Plan Application Letter of Intent
- Site Plan Application Submission Index (Updated Below)
- Signed Site Plan Review Application
- Site Plan Application Checklist
- Technical District Design Guidelines Checklist
- Building and Campus Development Renderings
- Civil Permitting Plans
- Engineer’s Report
- Storm Water Pollution Prevention Plan & Stormwater Design Report
Draft Project Cost Benefit Analysis (Updated Below)
Site Plan Application - January 23, 2026
- Letter of Transmittal
- Site Plan Application Submission Index
- Site Plan Application Checklist
- Technical District Design Guidelines Checklist
- Town of Alabama Planning Board Findings Form
- Building and Campus Development Renderings
- Civil Permitting Plans
- Engineer’s Report
- Storm Water Pollution Prevention Plan & Stormwater Design Report
- Progressive Aging Renderings
- Alta 1
- Alta 2
Project Application (Updated Below)
Initial Resolution - February 5, 2026
Lead Agency Resolution - February 5, 2026
Revised SEQR Development Application - February 18, 2026
0 - Cover and Table of Contents
III - Technical Summaries and Exhibits
- A - Architectural Massing and Elevations
- B - Visual Impact Analysis Technical Summary
- C - Site Plans
- D - Stormwater Technical Summary
- E - Stormwater Plans
- F - Photometric Plan
- G - Landscape Plan
- H - Traffic Technical Summary
- I - Utility Power Technical Summary
- J - Utility Power Overall Infrastructure Concept
- K - Backup Power Technical Summary
- L - Geotechnical Technical Summary
- M - USDA Soil Surveys
- N - Air Emissions Technical Summary
- O - Acoustics Technical Summary
- P - Emergency Services Confirmation Technical Summary
- Q - Emergency Response Procedures Technical Summary
- R - Disadvantaged Communities Burden Assessment
- S - SEQR EAF Part 1 Form
Response to Project Application Response Request - February 18, 2026 - Cover Letter - Responses
SEQR Update Memo - February 27, 2026
Supplemental Initial Resolution - March 5, 2026
Tech Team Memo on Revised SEQR Development Application - March 11, 2026
Cost Benefit Analysis with Executive Summary - March 12, 2026
County Planning Board Referral Notice of Final Action - March 12, 2026
Confirmation of County Water Availability - March 13, 2026
Site Plan Resubmission - March 18, 2026
- Letter of Transmittal
- Site Plan Resubmission
- Stormwater Pollution Prevention Plan & Stormwater Design Report (North Campus)
- Stormwater Pollution Prevention Plan & Stormwater Design Report (South Campus)
- Parking Assessment
- Traffic Engineering Assessment
- Engineer’s Report
- View Shed Study
- Building Elevations and Building Axon
- Exterior Wall Systems
- Noise Modeling Results
- Water & Sewer Usage Memo
- Agricultural Data Statement
- Air Cooled Chiller System Overview
- Construction Truck Routes
- Responses to Planning Board Questions
- Site Lighting Narrative
- Utility Power Technical Summary
- Response to 1st Engineering Review Memo
- Response to 1st Planning Review Memo
- Response to 1st Landscape Plan Comments
- 2021 Geotechnical Engineering Report (South Campus)
Public Hearing - March 19, 2026 - Notice - Presentation - Transcript - Archived Livestream - Comments were also accepted by email.
Supplemental Public Hearing Resolution - March 26, 2026
Revised SEQR Development Application - April 6, 2026
0 - Cover and Table of Contents
I & II - Introduction and Project Description
III - Technical Summaries and Exhibits
- A - Architectural Massing and Elevations
- B - Visual Impact Analysis Technical Summary
- C - Site Plans 1 of 2
- C - Site Plans 2 of 2
- D - Stormwater Technical Summary
- E - Stormwater Plans
- F - Photometric Plan
- G - Landscape Plan
- H - Traffic Technical Summary
- I - Utility Power Technical Summary
- J - Utility Power Overall Infrastructure Concept
- K - Backup Power Technical Summary
- L - Geotechnical Technical Summary
- M - USDA Soil Surveys
- N - Air Emissions Technical Summary
- O - Acoustics Technical Summary
- P - Emergency Services Confirmation Technical Summary
- Q - Emergency Response Procedures Technical Summary
- R - Disadvantaged Communities Burden Assessment
- S - SEQR EAF Part 1 Form
- T - Supplemental Information
Response to Project Application Response Request - April 6, 2026 - Cover Letter - Responses
Public Hearing - April 16, 2026 - Notice - Transcript - Archived Livestream - Video on Demand 1 of 3, 2 of 3, 3 of 3 - Comments were also accepted by mail and email - Comments Received Before Deadline 1 - Comments Received Before Deadline 2 - Comments Received After Deadline
Noise Modeling Results - April 23, 2026
Emergency Services Discussion - May 7, 2026
Minutes - Summers - Thompson - Yaeger
Site Plan Resubmission - May 26, 2026
- Transmittal Letter
- Civil Site Plans
- Acoustic Report Update
- Alternative Architectural Renderings
- Engineering System Design Narratives
- Memo #1 - Wetlands
- Memo #2 - Dewatering
- Memo #3 - Heat Island Effect
Response to Project Application Response Request - May 27, 2026 - Responses - Supplemental Information
Energy Memo - June 4, 2026
Documents related to previous SEQR Updates are available at gcedc.com/stampseqr
2025 Projects
Graham Corporation
Project Details - Graham Corporation is proposing to construct a 2,000 square-foot radiographic testing building as an addition to an existing manufacturing building in the City of Batavia.
Initial Resolution - January 16, 2025
Public Hearing - January 30, 2025 - Notice - Minutes - Video
Final Resolution - February 6, 2025
Project Close Date - April 21, 2025
PARIS Project Number - 1801 25 01A
202 Oak St, LLC
Project Details - 202 Oak St, LLC is proposing to renovate a 54-unit hotel in the City of Batavia that has been idle since the Covid pandemic.
Initial Resolution - January 16, 2025
Public Hearing - January 30, 2025 - Notice - Minutes - Video
Final Resolution - February 6, 2025
Project Close Date - February 24, 2025
PARIS Project Number - 1801 25 02A
IVY VILLAGE CORP.
Project Details - Ivy Village Corp. is planning to construct 20 units of market-rate adult patio homes as the $3.5 million second phase of a three-phase, 60-unit development on 16 acres in the Village of LeRoy.
Initial Resolution - May 1, 2025
Public Hearing - May 28, 2025 - Notice - Minutes - Video
Final Resolution - June 5, 2025
Project Close Date - August 11, 2025
PARIS Project Number - 1801 25 05A
HP Hood, LLC
Project Details - HP Hood, LLC is planning to build a 7,722 sq ft facility at the Genesee Valley Agri Business Park in the town of Batavia with a total capital investment of $25,968,000. The project will include the construction of a two-bay, raw milk silo alcove and silo pads for four silos, Clean-in-Place (CIP) room for four CIP systems, remote truck testing lab and electrical room.
Initial Resolution - June 5, 2025
Public Hearing - June 26, 2025 - Notice - Minutes - Video
Final Resolution - July 10, 2025
Project Close Date - November 10, 2025
PARIS Project Number - 1801 25 06A
smartDESIGN Arhcitecture, PLLC
Project Details - smartDESIGN Architecture, PLLC is planning to renovate a vacant building at 4 Mix Place in the City of Batavia that will serves as the headquarters for the firm’s professional services.
The $480,000 project will renovate a local historic landmark that has not been occupied for several years and retains 12 FTE's for a company displaced by the recent closure of its Harvester Center facility by the property's owner.
Initial Resolution - July 10, 2025
Public Hearing - August 5, 2025 - Notice - Minutes - Video
Final Resolution - September 4, 2025
Project Close Date - November 6, 2025
PARIS Project Number - 1801 25 07A
Mega Properties, Inc
Project Details - Mega Properties, Inc. is proposing to construct a 165,000 square-foot distribution center in the Gateway II Corporate Park in the Town of Batavia.
Initial Resolution - August 7, 2025
Public Hearing - August 28, 2025 - Notice - Minutes - Video
Final Resolution - September 4, 2025
8250 Park Rd, LLC
Project Details - 8250 Park Rd, LLC is proposing to renovate a 125,000 square-foot hotel in the Town of Batavia into a 99-unit Holiday Inn and a 68-unit Candlewood Suites.
Project Application (Updated Below)
Initial Resolution - October 2, 2025
Public Hearing - October 22, 2025 - Notice - Minutes - Video
Full Environmental Assessment Form - December 28, 2025
Final Resolution - March 26, 2026
2024 Projects
MedTech Landing, LLC
Project Details - MedTech Landing, LLC is proposing to develop 80 units of market-rate housing in the town of Batavia. The $15 million project would construct seven apartment buildings totaling 100,000 square-feet and anticipates creating two full-time-equivalent (FTE) positions.
Initial Resolution - January 11, 2024
Public Hearing - February 8, 2024 - Notice - Minutes - Video
Final Resolution - March 7, 2024
Project Close Date - March 22, 2024
PARIS Project Number - 1801 24 01A
Leatherleaf Solar LLC
Project Details - Leatherleaf Solar, LLC is proposing to construct a community solar farm project on Ivison Road in the Town of Byron. The project will generate 5 MW (AC) of power.
Initial Resolution - March 7, 2024
Public Hearing - March 26, 2024 - Notice - Minutes - Video
Final Resolution - March 28, 2024
Project Close Date - March 17, 2025
Assignment Authorizing Resolution - September 4, 2025
PARIS Project Number - 1801 24 02A
GE Bergen Owner, LLC
Project Details - GE Bergen Owner, LLC (Oxbo) is building a 196,000 square-foot facility at Apple Tree Acres in Bergen. The $43.6 million project proposes creating 60 new full-time equivalent (FTE) positions and retaining 140 FTE's.
Initial Resolution - June 6, 2024
Public Hearing - June 25, 2024 - Notice - Minutes - Video
Final Resolution - August 1, 2024
Project Close Date - September 11, 2024
Assignment Resolution - March 5, 2026
PARIS Project Number - 1801 24 03A
Graham Corporation
Project Details - Graham Corporation is proposing to build a 28,867 square-foot exapnsion to its City of Batavia facilities. The $17.6 million project proposes to creating 24 new full-time equivalent (FTE) positions and retain 267 FTE's.
Initial Resolution - July 11, 2024
Public Hearing - July 17, 2024 - Notice - Minutes - Video
Final Resolution - August 1, 2024
Project Close Date - August 28, 2024
PARIS Project Number - 1801 23 09A
FFP NY LeRoy Project1, LLC
Project Details - FFP NY LeRoy Project1, LLC is proposing to construct a $13.5 million project that would generate 5 MW (AC) of solar energy in the town of LeRoy.
Initial Resolution - August 1, 2024
Public Hearing - August 21, 2024 - Notice - Minutes - Video
Final Resolution - September 5, 2024
Project Close Date - February 27, 2025
PARIS Project Number - 1801 24 04A
FFP NY LeRoy Project2, LLC
Project Details - FFP NY LeRoy Project2, LLC is proposing to construct a $6.5 million project that would generate 2 MW (AC) of solar energy in the town of LeRoy.
Initial Resolution - August 1, 2024
Public Hearing - August 21, 2024 - Notice - Minutes - Video
Final Resolution - September 5, 2024
Project Close Date - February 27, 2025
PARIS Project Number - 1801 24 05A
9 Lent Avenue, LLC
Project Details - 9 Lent Avenue, LLC (Rochester Davis Fetch Corp.) is proposing to expand its operations with the purchase and renovation of an existing facility in the village of LeRoy. The $3.8 million project includes renovation of the 32,500 square-foot facility and the creation of 4 new full-time equivalent (FTE) positions.
Initial Resolution - September 5, 2024
Public Hearing - October 1, 2024 - Notice - Minutes - Video
Final Resolution - October 3, 2024
Project Close Date - October 16, 2024
PARIS Project Number - 1801 24 06A
Appletree Acres, LLC
Project Details - Appletree Acres, LLC is proposing to construct a 20,000 square-foot expansion to an existing 50,000 square-foot warehouse located at the Apple Tree Acres corporate park. The $1.237 million project proposes creating 4 FTEs with an estimated salary range of $45,000 to $65,000 annually plus benefits.
Initial Resolution - December 18, 2024
Public Hearing - January 3, 2024 - Notice - Minutes - Video
Supplemental Resolution - March 27, 2025
Supplemental Public Hearing - April 21, 2025 - Notice - Minutes - Video
Final Resolution - May 1, 2025
Project Close Date - July 16, 2025
PARIS Project Number - 1801 24 07A
9 Lent Avenue, LLC
Project Details - 9 Lent Avenue, LLC (Rochester Davis Fetch Corp.) is proposing to expand its operations with the construction of an 8,000 sq. ft. pole barn at 9 Lent Avenue in the village of LeRoy. The $265,000 project is in addition to the $3.8 million project to renovate an existing facility at 9 Lent Avenue and will be a stand-alone building for light fabrication and storage. This project proposes creating 2 new full-time equivalent (FTE) positions.
Final Resolution - December 18, 2024
Project Close Date - January 6, 2025
PARIS Project Number - 1801 24 08A
2023 Projects
Atlas Copco USA Holdings Inc. & Subsidiaries (Edwards)
Project Details - The company is constructing a new semiconductor dry pump manufacturing facility at STAMP in the Town of Alabama.
Initial Resolution - January 12, 2023
Public Hearing - January 31, 2023 - Notice - Minutes - Video
Final Resolution - February 2, 2023
Project Close Date - September 28, 2023
PARIS Project Number - 1801 23 02A
GSPP Route 262, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Byron (Byron-Bergen Central School District).
Initial Resolution - March 30, 2023
Public Hearing - April 19, 2023 - Notice - Minutes - Video
Final Resolution - June 1, 2023
Assignment Resolution - September 5, 2024
PARIS Project Number - 1801 23 03A
LNK Holdings, Inc.
Project Details - The company purchased and expanded a food processing facility at Apple Tree Acres in the Town of Bergen.
Initial Resolution - May 4, 2023
Public Hearing - May 23, 2023 - Notice - Minutes - Video
Final Resolution - March 28, 2024
Project Close Date - April 26, 2024
PARIS Project Number - 1801 23 04A
Oak Orchard Solar 3, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Batavia (Elba Central School District).
Initial Resolution - August 3, 2023
Public Hearing - August 30, 2023 - Notice - Minutes - Video
Final Resolution - September 7, 2023
Project Close Date - January 30, 2024
Assignment Resolution - December 7, 2023
PARIS Project Number - 1801 23 06A
Countryside Apartments, LLC
Project Details - The company is constructing apartment buildings in the Town of Pembroke.
Initial Resolution - October 5, 2023
Public Hearing - October 25, 2023 - Notice - Minutes - Video
Final Resolution - October 26, 2023
Supplemental Resolution - March 7, 2024
Authorizing Resolution - May 2, 2024
Project Close Date - March 22, 2024
PARIS Project Number - 1801 23 08A
2022 Projects
Appletree Acres LLC
Project Details - The company constructed a logistics facility at Apple Tree Acres in the Town of Bergen.
Initial Resolution - January 13, 2022
Public Hearing - February 2, 2022 - Notice - Minutes - Video
Final Resolution - May 5, 2022
Project Close Date - June 29, 2022
PARIS Project Number - 1801 22 01A
O-AT-KA Milk Products, LLC
Project Details - The company expanded its facility in the Town of Batavia.
Initial Resolution - May 5, 2022
Public Hearing - May 23, 2022 - Notice - Minutes - Video
Final Resolution - June 2, 2022
Project Close Date - July 29, 2022
PARIS Project Number - 1801 22 04A
NEXgistics
Project Details - The company constructed a new logistics facility to serve as its national headquarters in the Town of Pembroke.
Initial Resolution - August 4, 2022
Public Hearing - August 22, 2022 - Notice - Minutes - Video
Final Resolution - September 1, 2022
Project Close Date - March 10, 2023
PARIS Project Number - 1801 22 07A
Ivy Village Corp
Project Details - The company constructed 20 residential apartments in the Village of LeRoy.
Initial Resolution - July 7, 2022
Public Hearing - July 26, 2022 - Notice - Minutes - Video
Final Resolution - August 4, 2022
Project Close Date - July 28, 2023
PARIS Project Number - 1801 22 08A
AES Rt 5 Storage LLC
Project Details - The company constructed a 5 MW solar project in the Town of LeRoy (LeRoy Central School District).
Initial Resolution - November 1, 2022
Public Hearing - November 22, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - June 24, 2024
PARIS Project Number - 1801 22 10A
Hecate Energy Cider Solar LLC
Project Details - The company constructed a 500 MW solar project in the Town of Elba and Town of Oakfield (Elba Central School District and Oakfield-Alabama Central School District).
Initial Resolution - November 1, 2022
Public Hearing (Elba) - November 28, 2022 - Notice - Minutes - Video
Public Hearing (Oakfield) - November 28, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Supplemental Resolution - September 19, 2024
Supplemental Public Hearing (Elba) - October 3, 2024 - Notice - Minutes - Video
Supplemental Public Hearing (Oakfield) - October 3, 2024 - Notice - Minutes - Video
Supplemental Resolution - October 3, 2024
Project Close Date - September 13, 2024
PARIS Project Number - 1801 22 11 A
RPNY Solar 6 LLC
Project Details - The company constructed a 3 MW solar project in the Town of Batavia (Alexander Central School District).
Initial Resolution - November 1, 2022
Public Hearing - November 21, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - August 3, 2023
Assignment Resolution - June 1, 2023
PARIS Project Number - 1801 22 12A
RPNY Solar 7 LLC
Project Details - The company constructed a 2.5 MW solar project in the Town of Batavia (Batavia City School District).
Initial Resolution - November 1, 2022
Public Hearing - November 21, 2022 - Notice - Minutes - Video
Final Resolution - December 1, 2022
Project Close Date - August 3, 2023
Assignment Resolution - June 1, 2023
Authorizing Resolution - December 5, 2024
PARIS Project Number - 1801 22 13A
NY CDG Genesee 4 LLC
Project Details - The company constructed a 4.275 MW solar project in the Town of Pavilion (Pavilion Central School District).
Initial Resolution - December 1, 2022
Public Hearing - January 4, 2023 - Notice - Minutes - Video
Final Resolution - January 12, 2023
Project Close Date - February 29, 2024
PARIS Project Number - 1801 22 14A
2021 Projects
LandPro Equipment LLC
Project Details - The company constructed a new facility in the Town of Batavia.
Initial Resolution - February 4, 2021
Public Hearing - February 24, 2021 - Notice - Minutes - Video
Final Resolution - March 4, 2021
Project Close Date - June 25, 2021
PARIS Project Number - 1801 21 01A
Plug Power Inc.
Project Details - The company is constructing a new facility at STAMP in the Town of Alabama.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - March 25, 2021
Public Hearing - June 3, 2021 - Notice - Minutes - Video
Supplemental Resolution - June 3, 2021
Authorizing Resolution - October 6, 2022
Project Close Date - November 8, 2021
PARIS Project Number - 1801 21 04A
Forefront Power LLC (Elba Solar)
Project Details - The company constructed a 5 MW solar project in the Town of Elba.
Initial Resolution - March 4, 2021
Public Hearing - March 22, 2021 - Notice - Minutes - Video
Final Resolution - May 6, 2021
Project Close Date - October 20, 2023
Assignment Resolution - May 4, 2023
PARIS Project Number - 1801 21 05A
Excelsior Energy Center
Project Details - The company constructed a 280 MW solar project in the Town of Byron (Byron-Bergen School District).
Initial Resolution - March 25, 2021
Public Hearing - April 19, 2021 - Notice - Minutes - Video
Final Resolution - June 3, 2021
Authorizing Resolution - September 7, 2023
Project Close Date - April 11, 2025
PARIS Project Number - 1801 21 06A
Batavia Special Needs Apartments
Project Details - The company constructed an expansion to its residential facility in the City of Batavia.
Initial Resolution - March 25, 2021
Public Hearing - April 14, 2021 - Notice - Minutes - Video
Final Resolution - May 6, 2021
Project Close Date - September 15, 2021
PARIS Project Number - 1801 21 09A
NY CDG Genesee 1 LLC
Project Details - The company constructed a 5 MW solar project in the Town of Elba (Elba School District).
Initial Resolution - May 6, 2021
Public Hearing - May 17, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Project Close Date - February 29, 2024
Assignment Resolution - January 12, 2023
PARIS Project Number - 1801 21 11A
Trousdale Solar, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Batavia (Batavia School District).
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Authorizing Resolution - September 1, 2022
Project Close Date - April 7, 2022
PARIS Project Number - 1801 21 12A
Trousdale Solar II, LLC
Project Details - The company constructed a 4 MW solar project in the Town of Batavia (Batavia School District).
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Authorizing Resolution - September 1, 2022
Project Close Date - April 7, 2022
PARIS Project Number - 1801 21 13A
Gateway GS, LLC
Project Details - The company constructed a new facility in the Gateway II Corporate Park in the Town of Batavia.
Initial Resolution - July 1, 2021
Public Hearing - July 23, 2021 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Updated Final Resolution - January 13, 2022
Authorizing Resolution - March 3, 2022
Project Close Date - September 29, 2021
PARIS Project Number - 1801 21 15A
Liberty Pumps
Project Details - The company constructed an expansion to its manufacturing facility in Apple Tree Acres business park in the Town of Bergen.
Initial Resolution - August 5, 2021
Public Hearing - August 26, 2021 - Notice - Minutes - Video
Final Resolution - September 9, 2021
Project Close Date - November 21, 2021
PARIS Project Number - 1801 21 16A
Valiant Real Estate USA, Inc.
Project Details - The company constructed a new facility in the Town of Batavia.
Initial Resolution - September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - December 2, 2021
Project Close Date - December 21, 2021
PARIS Project Number - 1801 21 17A
J&R Fancher Property Holdings LLC (Brickhouse Commons LLC)
Project Details - The company constructed a mixed-use facility at Buffalo East Technology Park in the Town of Pembroke.
Initial Resolution - September 9, 2021
Public Hearing - October 5, 2021 - Notice - Minutes - Video
Final Resolution - October 7, 2021
Project Close Date - May 19, 2022
PARIS Project Number - 1801 21 18A
Mega Properties
Project Details - The company purchased and renovated an existing facility in Gateway I Corporate Park in the Town of Batavia.
Initial Resolution - December 2, 2021
Public Hearing - December 21, 2021 - Notice - Minutes - Video
Final Resolution - January 13, 2022
Project Close Date - December 2, 2022
PARIS Project Number - 1801 21 19A
2020 Projects
241 Knapp Solar 1, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Pembroke (Akron School District).
Initial Resolution - February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 01A)
241 Knapp Solar 2, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Pembroke (Akron School District).
Initial Resolution - February 6, 2020
Public Hearing - February 28, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 02A)
Townline Batavia Solar 1, LLC
Project Details - The company constructed a 5 MW solar project in the Town of Batavia (Elba School District).
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - December 22, 2020
Report to PARIS - Yes (Project 1801 20 03A)
3104 Batavia Solar, LLC
Project Details - The company constructed a 3 MW solar project in the Town of Batavia (Pembroke School District).
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - May 22, 2020
Report to PARIS - Yes (Project 1801 02 04A)
3232 Batavia Solar, LLC
Project Details - The company constructed a 4 MW solar project in the Town of Batavia (Pembroke School District).
Initial Resolution - February 6, 2020
Public Hearing - March 2, 2020 - Notice - Minutes - Video
Final Resolution - March 5, 2020
Project Close Date - May 22, 2020
Report to PARIS - Yes (Project 1801 02 05A)
Bright Oak Solar, LLC
Project Details - The company constructed a 4 MW solar project in the Town of Batavia (Oakfield-Alabama School District).
Initial Resolution - May 7, 2020
Public Hearing - May 26, 2020 - Notice - Minutes - Video
Final Resolution - June 4, 2020
Project Close Date - September 30, 2020
Report to PARIS - Yes (1801 20 09A)
Fraser-Branche Property, LLC
Project Details - The company purchased and renovated a mixed-use medical and office facility in the City of Batavia.
Initial Resolution - October 31, 2019
Public Hearing - November 20, 2019 - Notice - Minutes
Final Resolution - July 2, 2020
Project Close Date - September 3, 2020
Report to PARIS - Yes (Project 1801 20 10A)
Batavia Solar, LLC
Project Details - The company constructed a 1.65 MW solar project in the Town of Batavia (Byron-Bergen School District).
Initial Resolution - August 6, 2020
Public Hearing - September 2, 2020 - Notice - Minutes - Video
Final Resolution - August 5, 2021
Project Close Date - January 27, 2023
Assignment Resolution - August 1, 2024
Assignment Resolution - October 3, 2024
Report to PARIS - Yes (1801 21 14A)
2019 Projects
Churchville Fire Equipment Corp.
Project Details - The company purchased and renovated an existing facility in the Town of Pavilion.
Final Resolution - January 10, 2019
Project Close Date - February 7, 2019
Report to PARIS - Yes (Project 1801 19 01A)
CVO Central, LLC (Custom Vehicle Outfitters)
Project Details - The company purchased and renovated a manufacturing facility in the City of Batavia for their operations.
Final Resolution - March 28, 2019
Project Close Date - June 24, 2019
Report to PARIS - Yes (Project 1801 19 03A)
Gateway GS, LLC
Project Details - The company completed the interior buildout of a new facility at Gateway II Corporate Park in the Town of Batavia.
Initial Resolution - February 7, 2019
Public Hearing - March 5, 2019 - Notice - Minutes
Final Resolution - March 7, 2019
Project Close Date - May 1, 2019
Report to PARIS - Yes (Project 1801 19 04A)
Mucher & Clark, LLC (Cedar Street Rentals)
Project Details - The company constructed a warehouse in the City of Batavia to expand its operations.
Final Resolution - June 6, 2019
Project Close Date - October 4, 2019
Report to PARIS - Yes (Project 1801 19 05A)
Graham Corporation
Project Details - The company constructed an expansion of their facility in the City of Batavia, including a renovation of existing facilities.
Project Application / Supplemental Project Application
Initial Resolution - February 7, 2019
Public Hearing - February 26, 2019 - Notice - Minutes
Final Resolution - August 1, 2019
Supplemental Initial Resolution - August 1, 2019
Supplemental Public Hearing - August 26, 2019 - Notice - Minutes
Supplemental Final Resolution - September 5, 2019
Project Close Date - November 1, 2019
Report to PARIS - Yes (Project 1801 19 06A)
Provident Batavia, LLC
Project Details - The company constructed an expansion to their facility in the Town of Batavia.
Initial Resolution - July 11, 2019
Public Hearing - July 30, 2019 - Notice - Minutes
Final Resolution - September 5, 2019
Project Close Date - November 12, 2019
Report to PARIS - Yes (Project 1801 19 07A)
Wright Associates, LLC
Project Details - The company will purchase and renovate a logistics facility in the Village of LeRoy to expand product lines and regional distribution markets.
Initial Resolution - October 3, 2019
Public Hearing - October 29, 2019 - Notice - Minutes
Final Resolution - October 31, 2019
Project Close Date - November 27, 2019
Report to PARIS - Yes (Project 1801 19 09A)
Ken Wendt's Propane Gas Service, Inc.
Project Details - The company constructed a new facility in the Town of LeRoy to expand its services.
Initial Resolution - August 1, 2019
Public Hearing - August 27, 2019 - Notice - Minutes
Final Resolution - October 31, 2019
Authorizing Resolution - March 29, 2022
Project Close Date - December 18, 2019
Report to PARIS - Yes (Project 1801 19 10A)
2018 Projects
Saile Properties, LLC (L&M Specialty Fabrication)
Project Details - The company constructed an agricultural equipment manufacturing facility in the Town of Batavia.
Initial Resolution - September 1, 2016
Public Hearing - September 21, 2016 - Notice - Minutes
Final Resolution - February 1, 2018
Project Close Date - April 1, 2018
Report to PARIS - Yes (Project 1801 18 02A)
Xylem Dewatering Solutions, Inc.
Project Details - The company constructed an expansion of their facility in the Town of Batavia.
Initial Resolution - March 29, 2018
Public Hearing - April 17, 2018 - Notice - Minutes
Final Resolution - May 3, 2018
Project Close Date - May 31, 2018
Report to PARIS - Yes (Project 1801 18 03A)
Genesee Lumber Co., Inc.
Project Details - The company will demolish an existing structure and construct a new facility in the City of Batavia.
Final Resolution - March 29, 2018
Project Close Date - February 28, 2019
Report to PARIS - Yes (Project 1801 18 04A)
J-Rental, Inc.
Project Details - The company constructed a logistics facility at Apple Tree Acres in the Town of Bergen.
Initial Resolution - June 7, 2018
Public Hearing - June 26, 2018 - Notice - Minutes
Final Resolution - July 12, 2018
Project Close Date - February 27, 2019
Report to PARIS - Yes (Project 1801 18 05A)
Pearl Solar, LLC
Project Details - The company constructed a 2 MW solar project in the Town of Batavia.
Initial Resolution - July 12, 2018
Public Hearing - July 30, 2018 - Notice - Minutes
Final Resolution - August 2, 2018
Project Close Date - January 11, 2019
Report to PARIS - Yes (Project 1801 18 07A)
Pearl Solar II, LLC
Project Details - The company constructed a 2 MW solar project in the Town of Batavia.
Initial Resolution - July 12, 2018
Public Hearing - July 30, 2018 - Notice - Minutes
Final Resolution - August 2, 2018
Project Closing Date - January 11, 2019
Report to PARIS - Yes (Project 1801 18 08A)
Amada North America, Inc.
Project Details - The company will expand their manufacturing facility in the City of Batavia and invest in new manufacturing equipment.
Initial Resolution - September 6, 2018
Public Hearing - October 2, 2018 - Notice - Minutes
Final Resolution - October 4, 2018
Project Close Date - November 9, 2018
Report to PARIS - Yes (Project 1801 18 10A)
2017 Projects
HP Hood, LLC (Project Dairy) - 1801 17 01A
Project Details - The company will purchase, refurbish, restart and expand a dairy processing facility at the Genesee Valley Agri-Business Park in the town of Batavia.
Initial Resolution - June 12, 2017
Public Hearing - June 27, 2017 - Notice - Minutes
Final Resolution - June 27, 2017
Project Close Date - June 30, 2017
Report to PARIS - Yes (Project 1801 17 01A)
ADVJ Realty, LLC (Coach Tony's)
Project Details - The company constructed a food processing facility at the Apple Tree Acres Corporate Park in the Town of Bergen.
Final Resolution - July 11, 2017
Project Close Date - February 20, 2018
Assignment Resolution - May 4, 2023
Report to PARIS - Yes (Project 1801 17 02A)
Freightliner & Western Star of Batavia, LLC
Project Details - The company constructed a diesel truck service center in the Town of Batavia.
Initial Resolution - July 14, 2016
Public Hearing - July 29, 2016 - Notice - Minutes
Final Resolution - July 11, 2017
Project Close Date - August 31, 2018
Report to PARIS - Yes (Project 1801 17 03A)
Genesee and Mohawk Valley Railroad Co., Inc. (GVT)
Project Details - The company will expand its existing cross dock facility in the City of Batavia.
Initial Resolution - March 2, 2017
Public Hearing - March 28, 2017 - Notice - Minutes
Final Resolution - May 4, 2017
Project Close Date - August 15, 2017
Report to PARIS - Yes (Project 1801 17 04A)
6520 N. Lake Rd, LLC (Triple-O Mechanical)
Project Details - The company will expand their facility in the Town of Bergen.
Final Resolution - October 5, 2017
Project Close Date - January 1, 2018
Report to PARIS - Yes (Project 1801 17 08A)
212 West Main Street, Inc.
Project Details - The company will renovate an existing food service facility in a federally designated flood hazard area in/or adjacent to a highly distressed census tract in the City of Batavia.
Final Resolution - October 5, 2017
Project Close Date - November 1, 2017
Report to PARIS - Yes (Project 1801 17 09A)
O-AT-KA Milk Products Cooperative, Inc.
Project Details - The company plans to expand their dairy processing facility in Batavia.
Initial Resolution - October 5, 2017
Public Hearing - October 24, 2017 - Notice - Minutes
Final Resolution - October 26, 2017
Project Close Date - March 1, 2018
Report to PARIS - Yes (Project 1801 17 11A)
2016 Projects
Genesee County Chamber of Commerce
Project Details - The company plans to purchase and renovate an exisitng building in Batavia for the offices of the Genesee County Chamber of Commerce and an expanded Genesee County Visitors Center.
Final Resolution - October 1, 2015
Project Close Date - January 29, 2016
Report to PARIS - Yes (Project 1801 16 01A)
Upstate Niagara Cooperative (former Alpina Foods LLC)
Project Details - The former owner of the facility, now owned by Upstate Niagara Cooperative, expanded their dairy processing facility.
Final Resolution - May 5, 2016
Project Close Date - May 5, 2016
Report to PARIS - Yes (Project 1801 16 03A)
Mega Properties
Project Details - The company plans to expand its facility in the town of Batavia.
Initial Resolution - March 3, 2016
Public Hearing - March 23, 2016 - Notice - Minutes
Final Resolution - November 4, 2016
Authorizing Resolution - December 16, 2016
Project Close Date - May 12, 2017
Report to PARIS - Yes (Project 1801 16 04A)
Empire Pipeline Inc.
Project Details - The company will operate a compressor station and pipeline in Oakfield. The project will generate revenues to enable water infrastrucutre in Genesee County.
Initial Resolution - October 6, 2016
Public Hearing - October 24, 2016 - Notice - Minutes
Final Resolution - December 1, 2016
Project Close Date - December 1, 2016
Report to PARIS - Yes (Extension of Project 1801 07 04B)
2015 Projects
Manning Squires & Hennig
Project Details - The company will expand their offices and maintenace facilities in the Town of Batavia.
Initial Resolution - June 4, 2015
Public Hearing - June 23, 2015 - Notice - Minutes
Final Resolution - June 25, 2015
Authorizing Resolution - December 17, 2015
Project Close Date - June 25, 2015
Report to PARIS - Yes (Project 1801 15 04A)
OATKA Milk Products Cooperative Inc.
Project Details - The company will expand its dairy processing facility in the City of Batavia and Town of Batavia.
Initial Resolution - August 13, 2015
Public Hearing - August 31, 2015 - Notice - Minutes
Final Resolution - September 3, 2015
Project Close Date - October 1, 2015
Report to PARIS - Yes (Project 1801 15 06A)
Reinhart Enterprises
Project Details - The company is expanding its facility in the City of Batavia.
Initial Resolution - September 3, 2015
Public Hearing - September 23, 2015 - Notice - Minutes
Final Resolution - October 1, 2015
Project Close Date - October 1, 2015
Report to PARIS - Yes (Project 1801 15 07A)
2014 Projects
Tompkins Insurance Agencies, Inc.
Project Details - The company purchased and made capital improvements to a facility in the City of Batavia.
Final Resolution - March 6, 2014
Project Close Date - April 7, 2014
Report to PARIS - Yes (Project 1801 14 01A)
Mega Properties, Inc.
Project Details - The company expanded its logistics facility in the Gateway I Corporate Park in the Town of Batavia.
Initial Resolution - June 6, 2013
Public Hearing - June 26, 2013 - Notice - Minutes
Final Resolution - April 3, 2014
Project Close Date - June 16, 2014
Report to PARIS - Yes (Project 1801 14 03A)
R.J. Properties LLC (Liberty Pumps)
Project Details - The company expanded its facility in the Apple Tree Acres business park in the Town of Bergen.
Initial Resolution - March 6, 2014
Public Hearing - April 3, 2014 - Notice - Minutes
Final Resolution - May 1, 2014
Project Close Date - August 1, 2014
Report to PARIS - Yes (Project 1801 14 06A)
2013 Projects
CLP Darien Lake, LLC
Project Details - The company made capital improvements to its entertainment facility in the Town of Darien.
Initial Resolution - February 7, 2013
Public Hearing - March 1, 2013 - Notice - Minutes
Final Resolution - March 3, 2013
Project Close Date - February 7, 2013
Report to PARIS - Yes (Project 1801 13 01A)
Imagination Industries
Project Details - The company constructed a facility in the Town of Bergen.
Final Resolution - June 6, 2013
Authorizing Resolution - July 11, 2013
Project Close Date - July 11, 2013
Report to PARIS - Yes (Project 1801 13 07A)
Yancey’s Fancy
Project Details - The company constructed a new facility and made improvements to an existing facility, both in the Town of Pembroke.
Initial Resolution - March 7, 2013
Public Hearing - April 16, 2013 - Notice - Minutes
Supplemental Initial Resolution - September 5, 2013
Supplemental Public Hearing - September 25, 2013 - Notice - Minutes
Final Resolution - October 3, 2013
Project Close Date - March 25, 2014
Supplemental Initial Resolution - October 3, 2019
Supplemental Public Hearing - October 23, 2019 - Notice - Minutes
Supplemental Final Resolution - October 31, 2019
Project Close Date - April 1, 2020
Supplemental Project Agreement
Report to PARIS - Yes (Project 1801 13 14A)
Graham Corporation
Project Details - The company expanded its facility in the City of Batavia.
Initial Resolution - August 1, 2013
Public Hearing - August 21, 2013 - Notice - Minutes
Final Resolution - September 5, 2013
Supplemental Public Hearing - October 22, 2013 - Notice - Minutes
Supplemental Final Resolution - November 7, 2013
Supplemental Final Resolution - July 10, 2014
Project Close Date - August 1, 2013
Report to PARIS - Yes (Project 1801 13 17A)
2008 Projects
Batavia Special Needs APARTMENTS, L.P.
Project Details - The company constructed a housing facility in the City of Batavia.
Initial Resolution - February 29, 2008
Public Hearing - April 24, 2008 - Notice - Minutes
Final Resolution - November 25, 2008
Project Close Date - March 23, 2009
Report to PARIS - Yes (Project 1801 08 07A)
2007 Projects
Empire Pipeline
Project Details - The company constructed a natural gas compressor in the Town of Oakfield.
Initial Resolution - January 23, 2007
Public Hearing - March 13, 2007 - Notice - Minutes
Final Resolution - March 14, 2007
Project Close Date - July 1, 2007
Report to PARIS - Yes (Project 1801 07 04B)